Project: pbruce   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Patrick Bruce   -  
Project:   Bearhawk - Patrol   -   VIEW REPORTS
Total Hours:593
Total Flight Time:5
Start/Last Date:Mar 02, 2023 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=pbruce

Home or Last Project Picture

Jun 13, 2020     Install wiring conduit and pitot line - (5 hours)       Category: Wings
My neighbor is an avionics tech, and he said PET hollow tube is the best, lightest conduit. Getting up into the nose cavity forward of the spar is hard, so I ran the nav light conduit just aft of the fuel tank bay. It's about 4 feet of extra wire, but a much more reliable place to work. I ran the pitot hose up in front of the spar and it was indeed quite hard to work up there. I only had to go through about 8 ribs though. Im waiting for a friend who might have a pitot tube from a 182. Hopefully its12 volt, which will allow use of the pitot heater. Not sure if a 24 volt heater can be configured to run on a 12 volt system.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.